|
Product Detail :
|
The project involves the design, supply, construction, installation, testing, and commissioning of multiple sewage treatment plants (STPs) across various locations. The STPs will utilize different processes such as Waste Stabilization Pond (WSP) and Activated Sludge Process (ASP) with capacities ranging from 1.0 MLD to 2.0 MLD. Additionally, the scope includes operation and maintenance for a period of five years. Sewage Treatment Plant
|
| Tender Detail : |
The project involves the design, supply, construction, installation, testing, and commissioning of multiple sewage treatment plants (STPs) across various locations. The STPs will utilize different processes such as Waste Stabilization Pond (WSP) and Activated Sludge Process (ASP) with capacities ranging from 1.0 MLD to 2.0 MLD. Additionally, the scope includes operation and maintenance for a period of five years. |