Product Detail :
|
Revised Cost Estimate for Construction of 2 lane Major Bridge over Brahmaputra between Majuli on North Bank and Jorhat on South Bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on NH-715K in the state of Assam.(Job No715/AS/2020-21/213) Revised Cost Estimate for Construction of 2 lane Major Bridge over Brahmaputra between Majuli on North Bank and Jorhat on South Bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on NH-715K in the state of Assam.(Job No715/AS/2020-21/213)
|
Tender Detail : |
Revised Cost Estimate for Construction of 2 lane Major Bridge over Brahmaputra between Majuli on North Bank and Jorhat on South Bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on NH-715K in the state of Assam.(Job No715/AS/2020-21/213) #*. Revised Cost Estimate for Construction of 2 lane Major Bridge over Brahmaputra between Majuli on North Bank and Jorhat on South Bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on NH-715K in the state of Assam.(Job No715/AS/2020-21/213) |