Product Detail :
|
Construction of Proposed Solid Waste Management Plant at Makum ULB of Assam under SBM on Engineering, Procurement and Construction (EPC) Mode-1 Basis Establishment, Construction, Supply and Procurement, Fabrication, Erection of Machineries, Trial Run and Commissioning of Material Recovery Facility (MRF) and Wate to Compost (W2C) Plant at Makum as per SWM Rules 2016
|
Tender Detail : |
Construction of Proposed Solid Waste Management Plant at Makum ULB of Assam under SBM on Engineering, Procurement and Construction (EPC) Mode-1 Basis #*. Establishment, Construction, Supply and Procurement, Fabrication, Erection of Machineries, Trial Run and Commissioning of Material Recovery Facility (MRF) and Wate to Compost (W2C) Plant at Makum as per SWM Rules 2016 |